Define Every Requirement
Control characteristics, notes, specifications, materials, processes, tests, sampling, methods, tolerances, and acceptance criteria.
Our inspection control plan software defines what must be verified, where and when inspection occurs, how each characteristic is evaluated, what constitutes acceptance, and what action follows a failure. Manufacturers can control requirements by part, revision, supplier, and operation while preserving the completed results and permanent inspection history.
Open-source Microsoft Access software with Access or SQL Server backend options.
Controlled Product Verification
A control plan translates drawings, specifications, customer requirements, process controls, and risk-based decisions into instructions that inspectors can execute consistently. Instead of relying on individual knowledge or disconnected spreadsheets, the software connects each requirement with its inspection stage, method, device, sample, acceptance criteria, result, and reaction plan.
The application supports your inspection-planning process; it does not independently guarantee conformity with ISO 9001, AS9100, customer, contractual, or regulatory requirements. Your organization remains responsible for identifying applicable requirements, approving the plan, using suitable methods and equipment, and evaluating the resulting evidence.
Control characteristics, notes, specifications, materials, processes, tests, sampling, methods, tolerances, and acceptance criteria.
Deliver the correct plan by part, revision, supplier, operation, and inspection type so every inspector follows the approved requirements.
Record actual results, inspector, device, date, lot or serial traceability, attachments, acceptance, failures, and reaction activity.
End-to-End Inspection Planning
Maintain a controlled relationship among the applicable product configuration, planned verification, completed inspection, nonconforming results, and permanent history.
| Stage | Controlled Activities | Records Retained |
|---|---|---|
| 1. Establish Scope | Select receiving, in-process, final, source, first article, or other verification and identify the applicable part and revision. | Plan type, part, revision, customer, supplier, process, order, and reason |
| 2. Identify Requirements | Account for drawing characteristics, notes, specifications, materials, special processes, tests, and customer requirements. | Requirement source, characteristic number, drawing zone, operation, and classification |
| 3. Define Verification | Specify inspection method, measuring device, sampling level, frequency, responsibility, tolerance, and acceptance criteria. | Method, equipment type, sample, frequency, limits, and instructions |
| 4. Review and Release | Engineering, Quality, and Manufacturing review completeness and release the applicable revision for use. | Review comments, approval, effective date, status, and revision history |
| 5. Perform Inspection | Copy the approved plan into the inspection record and enter actual measurements, observations, evidence, and traceability. | Inspector, date, lot, serial number, device, result, attachments, and status |
| 6. Apply Reaction Plan | Stop, segregate, notify, reinspect, or create an NCMR according to the approved response for failed requirements. | Failure, affected quantity, hold, notification, NCMR, disposition, and reinspection |
| 7. Accept and Close | Confirm completion, reconcile quantities, resolve open failures, determine lot status, and approve the inspection. | Accepted and rejected quantities, result, approval, closure, and linked records |
| 8. Improve and Revise | Use results, defects, supplier history, changes, and corrective actions to revise future control plans when warranted. | Superseded revision, change reason, new approval, trends, and permanent history |
Configuration Control
Define control plans at the level needed by your operation. The released record can be associated with a part number, drawing revision, customer, supplier, manufacturing route, and specific operation so inspectors do not have to determine which requirements apply.
Characteristic Accountability
Each control-plan line can convert one product or process requirement into a clear, executable verification activity.
Characteristic number, drawing sheet and zone, note, specification, operation, description, nominal value, upper and lower limits, unit of measure, and classification.
Visual, dimensional, functional, material, certificate, document, process, or other verification with instructions and the required device or equipment type.
Sample size, frequency, acceptance criteria, pass/fail logic, responsible person, and the required response when the result is unacceptable.
First Article Inspection
An inspection control plan can be used for a First Article Inspection to identify and capture all applicable product requirements and the verification performed for each one. This creates a structured bridge from the drawing and specification baseline to characteristic accountability, actual results, calibrated equipment, supporting evidence, and acceptance status.
The control plan provides the detailed requirements and verification evidence. The FAI record separately controls why the FAI was performed, whether its scope is full or partial, the represented product and process configuration, completeness review, approvals, customer submission or response, and permanent FAI history. Used together, the two records avoid duplicate entry without losing their distinct purposes.
Sampling and Frequency
Configure the inspection method appropriate to the requirement, risk, customer direction, and documented procedure. The software records the selected plan; your organization determines whether that plan is valid for the product and contract.
Inspection Execution
When an inspection is created, the applicable plan can populate the requirements that the inspector must complete. The inspection retains its own copy so later plan revisions do not alter historical results.
Select requirements by part, revision, supplier, purchase order, lot, and receiving status. Verify product, documentation, certificates, and supplier controls.
Present requirements by work order, operation, router step, work center, part, and revision. Capture measurements while product remains in production.
Verify completed product, required records, quantity, configuration, marking, packaging, functional evidence, and release criteria before shipment.
Failed Verification
A failed inspection characteristic should make the affected product and required response immediately visible. The software can create or link an NCMR so the discrepancy, lot or serial numbers, quantity, hold location, disposition, correction, and reinspection remain connected.
Revision and Change Control
Release a new control-plan revision when requirements, drawings, suppliers, processes, methods, equipment, sampling, or reaction plans change. Historical inspection records continue to show the exact requirements in effect when the work was performed.
Record revision, change reason, owner, effective date, reviewer, approver, and current or superseded status.
Evaluate affected parts, suppliers, operations, open orders, work in process, inspection records, documents, training, and FAI scope.
Retain prior plans, completed inspections, results, failures, NCMRs, approvals, attachments, and the relationship to replacement revisions.
Connected Quality Records
Populate receiving, in-process, final, and FAI inspections and connect failures with product control, disposition, and reinspection.
Use control-plan requirements and results as characteristic accountability and verification evidence within the controlled FAI workflow.
Select the actual measuring device, confirm calibration status, and preserve device traceability for dimensional results.
Reference current drawings, specifications, inspection procedures, sampling instructions, and controlled work instructions.
Escalate qualifying failures and trends into containment, cause analysis, assigned actions, verification, and effectiveness review.
Review the official ISO 9001:2015 standard listing and the IAQG 9100 overview and support materials.
Open-Source and Customizable
The application is delivered with an open-source Microsoft Access front end, including forms, reports, queries, tables, and VBA source code. Adapt control-plan fields, requirement structures, sampling logic, approvals, inspection screens, reports, and integrations to your operation.
| Deployment | Best Fit |
|---|---|
| Access front end + Access back end | Smaller workgroups seeking a fast, economical deployment on a stable local network. |
| Access front end + SQL Server back end | Growing multi-user environments needing stronger concurrency, security controls, scalability, and data-management options. |
Optional QA Suite Add-On
Purchase Control Plans independently or add the application to the QA Suite at the discounted same-purchase price.
Stand-Alone
One-time software license
If purchased separately and integrated with another Database Providers module later, a $250 integration fee applies per module.
Ask About Stand-AloneAdd to the QA Suite
Discounted same-purchase add-on
Inspection Control Plans is an optional add-on and is not one of the five applications included in the $2,499 core QA Suite. The $399 add-on price applies when Control Plans is purchased with the QA Suite.
Implementation, customization, data conversion, training, report or form configuration, SQL Server setup, and ongoing support are quoted separately when requested.
Frequently Asked Questions
Inspection control plan software manages the product requirements, characteristics, inspection stages, methods, measuring equipment, sampling, acceptance criteria, reaction plans, revisions, approvals, completed results, and permanent inspection history used to verify manufactured product.
Yes. A control plan can capture all applicable drawing, specification, material, process, dimensional, and functional requirements and the verification result for each one. The controlled FAI record separately manages the FAI reason, full or partial scope, represented configuration, completion review, approvals, submission, customer response, and permanent FAI history.
No. The software can support documented inspection and product-verification processes, but your organization remains responsible for obtaining applicable standards and customer requirements, designing valid controls, using suitable equipment and methods, evaluating results, and operating an effective quality management system.
Yes. Plans can be associated with part, drawing revision, supplier, customer, inspection type, router, and operation so the correct requirements are presented for the applicable configuration and process stage.
The plan can define the equipment type or method required, and the completed inspection can identify the specific device used. Integration with Calibration Management allows its status and history to remain traceable to the result.
Yes. A failed characteristic can create or link to an NCMR containing the discrepancy, affected product and quantity, hold information, disposition, correction, and reinspection results.
No. The approved plan is copied into the inspection record so later plan changes do not overwrite the requirements or results used for an earlier inspection.
Yes. The open-source Microsoft Access application can be modified for your fields, forms, characteristic structures, sampling methods, workflows, reports, approvals, and integrations.
Control Plans is available as a discounted optional add-on but is not included among the five core QA Suite applications.
Standardize Product Verification
Discuss your receiving, in-process, final, and FAI requirements; sampling methods; inspection records; existing data; and Access or SQL Server deployment.